Period #3: duration must be positive, got 0 minutes.

Last updated: Mar 23, 2026

At a glance

One of the configured periods has a duration of zero or less.

What causes this error

Every period in the bell schedule must have a positive duration in minutes. This error appears when a period has been saved with a duration of zero or a negative value.

How to fix it

Go to Periods configuration, find the period at the indicated position in the list, and set a valid duration (e.g. 45 minutes).

Back